CDM consultancy in Malaysia

Safety designed in, from first drawing to handover.

A team certified by DOSH as CDM Professionals, supporting Clients, PCWDs, CWDs and PCWCs on Malaysia’s most complex construction projects under the CDM Regulations 2024.

Tower crane silhouetted against a dusk sky over the city

DOSH

Team certified as CDM Professionals

6 sectors

Data centres, rail, high-rise, mixed use, infrastructure, renewables

Malaysia-wide

West and East Malaysia

2024

Aligned to the CDM Regulations 2024

Our role

The CDM Regulations 2024 place clear duties on every party to a project. We help you meet them with rigour, without slowing the programme.

From concept design through construction and handover, our certified team works alongside your designers and contractors so that hazards are eliminated or reduced at source, duties are documented, and your project is ready for scrutiny.

Why CDM 2024 matters

Safety is now a legal duty from the first drawing.

1 June 2024

CDM Regulations in force. Design and management duties are now legally binding.

4 duty holders

Client, PCWD, CWD and PCWC each carry statutory, enforceable duties.

RM500,000

Maximum fine for key breaches, with up to 1 year imprisonment, or both.

30 days

Projects over 30 working days or 500 person-days must be notified to DOSH.

Client team in a project planning meeting

If you are the

Client

Make suitable project arrangements, provide pre-construction information and appoint competent duty holders.

We set up your CDM arrangements and check duty holders are competent.

Design team reviewing a floor plan

If you are the

PCWD

Principal Construction Work Designer

Plan, manage, monitor and coordinate health and safety in the pre-construction phase, so design risks are eliminated or reduced and remaining risks are passed on.

We lead design risk reviews and prepare the Safety & Health File.

Designer working on a CAD drawing

If you are the

CWD

Construction Work Designer

Apply the General Principles of Prevention (GPP) in their design to eliminate or reduce risks, and pass on information about remaining risks.

We support your design risk assessments and residual risk records.

Site team in PPE reviewing a method statement

If you are the

PCWC

Principal Construction Work Contractor

Plan, manage, monitor and coordinate the construction phase, including their own sub-contractors, designers and specialists, and review residual risks before work starts.

We support pre-construction reviews, method approvals and close-out.

Figures are statutory maximums under the OSH (Construction Work) (Design and Management) Regulations 2024.

Services

CDM consultancy services

Aerial view of an urban construction site

01

CDM Professional & Coordinator appointment

Certified professionals appointed to your project for its full duration.

02

Client duty advisory

Helping clients understand and discharge their duties from project inception.

03

PCWD, CWD & PCWC support

Practical support to designers and contractors on their CDM obligations.

04

Design risk reviews

Structured reviews that remove hazards at source, before they reach site.

05

Compliance audits & gap analysis

Independent assessment of project documentation, roles and arrangements.

06

Briefings & training

CDM 2024 briefings for project teams, clients and site leadership.

Sectors

Built for complexity.

01

Data centre server hall

Data centres

Fast-track, high-specification builds with dense M&E and live-commissioning risks.

02

Elevated metro station

Rail & mega projects

MRT and transit programmes with multiple packages, interfaces and public exposure.

03

Glass high-rise tower

High-rise buildings

Work at height, façade access and maintenance planned from the design stage.

04

Curved mixed-use development with retail podium

Mixed developments

Phased construction alongside occupied areas, retail and public interfaces.

05

Industrial steel structure

Infrastructure & bridges

Heavy temporary works, traffic interfaces and work over water or live roads.

06

Large-scale solar farm

Renewable energy

Solar and energy facilities with large open sites, electrical works and remote access.

Approach

With you from kick-off to close-out.

01

Plan

Set up CDM arrangements and duty holders from day one.

02

Design

Design out risks early, while change is cheapest.

03

Build

Review risks before work starts and support the site team.

04

Hand over

Deliver a complete Safety & Health File at close-out.

Safe by design

Risks are cheapest to remove on the drawing board.

We work from the top of the hierarchy of control. Whatever can be designed out is designed out; what remains is clearly passed to the next duty holder.

Most effective

EliminateDesign the hazard out

SubstituteUse a less hazardous option

Engineering controlsGuardrails, safe access, structural solutions

Administrative controlsProcedures and safe systems of work

PPEThe last resort

Least effective

Team reviewing marked-up design drawings

Why CDMS

Specialists, not generalists.

Certified professionals

Every engagement is led by team members certified by DOSH as CDM Professionals.

Complex-project experience

Our focus is projects where interfaces, programme pressure and risk are highest.

Across Malaysia

Serving projects across Malaysia, in both West (Peninsular) and East Malaysia (Sabah and Sarawak).

News & Updates

Latest from CDMS

View all updates

FAQ

CDM Regulations 2024: common questions

Answers for clients, designers and contractors working in Malaysia. For more detail, read our CDM Regulations 2024 guide.

What are the CDM Regulations 2024 in Malaysia?

The Occupational Safety and Health (Construction Work) (Design and Management) Regulations 2024, known as CDM 2024, came into force on 1 June 2024. They place legal duties for safety and health on clients, designers and contractors, from the design stage through construction to handover.

Who are the duty holders under CDM 2024?

The duty holders are the Client, the Principal Construction Work Designer (PCWD), Construction Work Designers (CWD), the Principal Construction Work Contractor (PCWC) and Construction Work Contractors (CWC). Each has specific duties under the Regulations.

What does the PCWD do?

The PCWD plans, manages, monitors and coordinates health and safety during the pre-construction phase, so that design risks are eliminated or reduced, and information on remaining risks is passed on.

What does the PCWC do?

The PCWC plans, manages, monitors and coordinates health and safety during the construction phase, including coordination between their own sub-contractors, designers and specialists, and reviews residual risks before work starts.

What does a CDM Professional do for my project?

A CDM Professional advises and supports duty holders so the project meets CDM 2024: setting up project arrangements, reviewing design risks, checking pre-construction and construction phase information, and preparing for handover. The CDMS team is certified by DOSH as CDM Professionals.

Do you provide PCWD and PCWC support services?

Yes. We support PCWDs, CWDs and PCWCs with design risk reviews, pre-construction reviews, method approvals and close-out documentation, so each duty holder can demonstrate compliance.

Does my project need to be notified to DOSH?

Projects above the notification threshold, such as those lasting more than 30 working days or exceeding 500 person-days, must be notified to DOSH. Check early whether your project meets the threshold; we can help you confirm it.

Where in Malaysia does CDMS work?

We serve projects across Malaysia, in both West (Peninsular) and East Malaysia (Sabah and Sarawak), including data centres, rail and MRT, high-rise buildings, mixed developments, infrastructure and renewable energy.

Contact

Planning a complex project in Malaysia?

Tell us about your project and a certified CDM Professional will get back to you.